Invitation to Bids

Code ABC Deadline of Bid Submission Attached File
Supply, Delivery, Installation and Testing of Chemical Laboratory Equipment for Research/Soils and Water Laboratory Group, Irrigation Engineering Center BS-015-2020 2,745,000.00 3 Nov 2020 - 1:30pm PDF icon ITB-BS-015-2020.pdf
Procurement of Dam Information Management System Including Supply, Delivery, Installation, Testing and Commisioning of Equipment BS-001-2020-R2 8,714,400.00 20 Oct 2020 - 1:30pm PDF icon ITB-BS-001-2020-R2.pdf
Supply, Delivery and Installation of Hyper Converged Infrastructure BS-012-2020 4,800,000.00 19 Oct 2020 - 1:30pm PDF icon ITB-BS-012-2020.pdf
Supply and Delivery of Brand New Thirty Four (34) Units Pick-up Truck, Double Cab, 4x4, DED, 3000 cc (max.) NIACO-S-5R 57,800,000.00 30 Sep 2020 - 12:00pm PDF icon ITB-NIACO-S-5R.pdf
Printing and Delivery of NIA Wall and Table Calendar for CY 2021 BS-008-2020 3,050,000.00 16 Sep 2020 - 9:30am PDF icon ITB-BS-008-2020.pdf
Supply, Delivery, Installation and Testing of Laboratory Equipment for Research/Soils and Water Laboratory Group, Irrigation Engineering Center BS-005-2020 10,661,000.00 15 Sep 2020 - 1:30pm PDF icon ITB-BS-005-2020.pdf
Procurement of Dam Information Management System Including Supply, Delivery, Installation, Testing and Commissioning of Equipment BS-001-2020-R 8,714,400.00 18 Aug 2020 - 1:30pm PDF icon ITB-BS-001-2020-R.pdf
Excavation of Re-Regulating Pond, Construction of Slope Protection and Drainage Inlet (Sta. 0+000 - Sta. 0+260 and Sta. 0+740 - Sta. 1+270) under the Lower Agno River Irrigation System Improvement Project R1-LARISIPD-C-2R 325,000,000.00 3 Aug 2020 - 12:00pm PDF icon ITB-R1-LARISIPD-C-2R.pdf
Supply, Delivery and Installation and Materials for Modular Workstation Including Electrical Works and Furniture for the Renovation of the Financial Management Department Office BS-002-2020 6,275,825.16 22 Jul 2020 - 9:30am PDF icon ITB-BS-002-2020.pdf
Procurement of Service Provider for the Phase II of Enhanced Farmland Geographic Infomation System (FGIS Digitization of Parcellary Maps and Farmland Database Development) BS-003-2020 49,748,520.50 30 Jun 2020 - 1:30pm PDF icon ITB-BS-003-2020.pdf
Supply, Delivery, Installation and Testing of Split Type Airconditioning Units for Irrigation Engineering Center ITB No. BS-004-2020 1,186,000.00 6 Apr 2020 - 1:30pm PDF icon ITB-BS-004-2020.pdf
Procurement of Dam Information Management System Including Supply, Delivery, Installation, Testing and Commissioning of Equipment BS-001-2020 8,714,400.00 10 Mar 2020 - 1:30pm PDF icon ITB-BS-001-2020.pdf
Excavation of Re-Regulating Pond, Construction of Slope Protection and Drainage Inlet (Sta. 0+00 - Sta. 0+260 and Sta. 0+740 - Sta. 1+270) under the Lower Agno River Irrigation System Imprvement Project Invitation to Bid No. R1-LARISIPD-C-2 R1-LARISIPD-C-2 325,000,000.00 18 Feb 2020 - 9:00am PDF icon ITB-R1-LARISIPD-C-2.pdf
Supply, Delivery and Testing of Mapping Grade Drone (Unmanned Aerial Vehicle) and Handheld Global Positioning System (GPS) BS-016-19 6,150,460.08 16 Dec 2019 - 1:30pm PDF icon ITB BS-016-19.pdf
Supply, Delivery and Installation of Materials for Modular Workspace including Electrical Works and Furniture for the Renovation of the Financial Management Department Office BS-014-19 3,884,891.75 12 Dec 2019 - 9:30am PDF icon ITB BS-014-19.pdf
Procurement of Dam Information Management System Including Supply, Delivery, Installation, Testing and Commissioning of Equipment BS-011-19 8,714,400.00 25 Nov 2019 - 1:30pm PDF icon ITB-BS-011-19.pdf
Renovation of the Commission on Audit office located at 2nd Floor NIA Building "A" BS-013-19 1,120,672.63 20 Nov 2019 - 1:30pm PDF icon ITB BS-013-19.pdf
Construction of Appurtenant Pump Structures, including Supply, Delivery, Installation, Testing and Commissioning of Pump, Electric Motors, Valves, Discharge/Steel Pipes and other Electro-Mechanical Works under the Alfonso Lista Pump Irrigation Project CAR-ALPIPD-C-2 458,140,437.66 20 Nov 2019 - 9:00am PDF icon CAR-ALPIPD-C-2.pdf
Construction of Balbalungao Earthfill Dam and its Appurtenant Structures under the Small Reservoir Irrigation Project SRIPD-C-33 841,142,606.00 15 Nov 2019 - 12:00pm PDF icon ITB-SRIPD-C-33.pdf
Construction of Ibato-Iraan Earthfill Dam and its Appurtenant Structures (Remaiining Works) under the Small Reservoir Irrigation Project SRIPD-C-20RW 326,650,392.00 14 Nov 2019 - 2:00pm PDF icon ITB-SRIPD-C-20RW.pdf
Construction of Sulvec Earthfill Dam and its Appurtenant Structures (Remaining Works) under the Small Reservoir Irrigation Project SRIPD-C-26RW 336,863,725.00 13 Nov 2019 - 2:00pm PDF icon ITB-SRIPD-C-26RW.pdf
Construction of Multipurpose Building NIA Complex, EDSA, Diliman, Quezon City BS-010-19-R 27,122,940.85 28 Oct 2019 - 1:30pm PDF icon ITB-BS-010-19-R.pdf
Supply, Delivery and Testing of 155 units Striker Fired 9mm Pistol BS-004-19 6,510,000.00 23 Oct 2019 - 9:30am PDF icon ITB-BS-004-19.pdf
Procurement of the CY 2019 Annual Physical Examination for National Irrigation Administration Central Office BS-009-19-R 1,761,265.00 22 Oct 2019 - 1:30pm PDF icon ITB-BS-009-19-R.pdf
Supply, Delivery, Installation and Testing of Various IT Equipment for Land and Water Resources Section (LWRS) Project Planning Division, Engineering Department BS-012-19 1,202,000.00 9 Sep 2019 - 1:30pm PDF icon ITB-BS-012-19.pdf
Procurement of the CY 2019 Annual Physical Examination for National Irrigation Administration Central Office BS-009-19 1,761,265.00 4 Sep 2019 - 9:30am PDF icon BS-009-19.pdf
Proposed Construction of Multipurpose Building NIA Complex, EDSA, Diliman, Quezon City BS-010-19 27,122,940.85 3 Sep 2019 - 1:30pm PDF icon ITB BS-010-19.pdf
Supply and Delivery of Eight (8) units Wheel Loader, 1.5 cu.m. (minimum) NIACO-S-6R 64,000,000.00 22 Aug 2019 - 2:00pm PDF icon NIACO-S-6R.pdf
Proposed Rehabilitation of Guard House at Gate 1&3 BS-008-19 2,295,398.21 14 May 2019 - 2:00pm PDF icon BS-008-19.pdf
Supply of Services for Certification, Recertification and Surveilance Audit for ISO 9001:2015 BS-006-19-R 2,004,000.00 6 May 2019 - 1:30pm PDF icon BS-006-19-R.pdf
Construction of Proposed Equipment Shed with Driver's Quarter NIA Central Office BS-007-19 2,702,208.88 17 Apr 2019 - 9:00am PDF icon BS-007-19.pdf
PRINTING AND DELIVERY OF NIA WALL CALENDAR AND NOTEBOOK PLANNER ITBNO. BS-003-19 3,450,000.00 8 Apr 2019 - 1:30pm PDF icon ITBNO_BS-003-19.pdf
Invitation to Bid No. R1-LARISIPD-C-1 R1-LARISIPD-C-1 225,000,000.00 2 Apr 2019 - 9:00am PDF icon Rl-LARISIPD-C-1.pdf
Supply of Security Services for NIA Central Office BS-001-19 7,944,268.63 6 Mar 2019 - 9:00am PDF icon ITB_BS-001-19.pdf