Supply and Delivery of Three (3) units Brand New Double Cab Pick-up Trucks and Two (2) units 12 ft. Dropside Body Pick-up Trucks |
MMIPII-S-1 |
8,400,000.00 |
MMIPII-S-1_supplemental-bid-bulletin-no.-3.pdf |
Construction of Bayuyan Earthfill Dam and its Appurtenant Structures in Region 6 under Small Reservoir Irrigation Project |
R6-BSRIPD-C-34R4 |
401,715,404.62 |
R6-BSRIPD-C-34R4_supplemental-bid-bulletin-no.-1.pdf |
Supply and Delivery of Three (3) units Brand New Double Cab Pick-up Trucks and Two (2) units 12 ft. Dropside Body Pick-up Trucks |
MMIPII-S-1 |
8,400,000.00 |
MMIPII-S-1_supplemental-bid-bulletin-no.- 2.pdf |
Supply and Delivery of Three (3) units Brand New Double Cab Pick-up Trucks and Two (2) units 12 ft. Dropside Body Pick-up Trucks |
MMIPII-S-1 |
8,400,000.00 |
MMIPII-S-1_supplemental-notice-no.-1.pdf |
Supply and Delivery of Seventeen (17) units Brand New Mini Dredging Equipment |
NIACO-S-12 |
140,000,000.00 |
NIACO-S-12_supplemental-notice-no.-1.pdf |
Construction of Additional and Remaining Works of Bonot-Bonot Earthfill Dam and its Appurtenant Structures in Region 7 under Small Reservoir Irrigation Project |
R7-BSRIPD-C-27RW |
227,607,253.06 |
R7-BSRIPD-C-27RW_supplemental-notice-no-1.pdf |
SUPPLEMENTAL BID BULLETIN NO. 1 to the BID DOCUMENTS for the Construction of Bayuyan Earthfill Dam and its Appurtenant Structures in Region VI under Small Reservoir Irrigation Project (SRIP) ITB No. R6-BSRIPD-C-34R3 |
R6-BSRIPD-C-34R3 |
401,715,404.62 |
R6-BSRIPD-C-34R3_SUPPLEMENTAL_1.pdf |
Supply and Delivery of Brand New One (1) Unit Sports Utility Vehicle, Diesel Engine Displacement, 3000cc (maximum), 4x2 under NIA-CAR, Alfonso Lista Pump Irrigation Project |
CAR-ALPIP-S-1R3 |
2,200,000.00 |
CAR-ALPIP-S-1R3_supplemental-notice-no-1.pdf |
Supply and Delivery of Brand New One (1) Sports Utility Vehicle, Diesel Engine Displacement, 3000cc (maximum), A/T 4x2 under NIA-CAR, Alfonso Lista Pump Irrigation Project |
CAR-ALPIP-S-1R3 |
2,200,000.00 |
CAR-ALPIP-S-1R3_supplemental-notice-no-1.pdf |
Procurement of Service Provider for the Phase IV of Enhanced Farmland Geographic Information System (eFGIS Digitization of Parcellary Maps and Farmland Database Development) |
NIACOIEC-S-3 |
47,799,000.00 |
Supplemental Notice No. 3 - NIACOIEC-S-3.pdf |
Procurement of Service Provider for the Phase IV of Enhanced Farmland Geographic Information System (eFGIS Digitization of Parcellary Maps and Farmland Database Development) |
NIACOIEC-S-3 |
47,799,000.00 |
Supplemental Notice No. 2 - NIACOIEC-S-3.pdf |
Construction of Bayuyan Earthfill Dam and its Appurtenant Structures in Region 6 under Small Reservoir Irrigation Project |
R6-BSRIPD-C-34R2 |
358,320,821.39 |
R6-BSRIPD-C-34R2_supplemental- notice-no.-1.pdf |
Procurement of Service Provider for the Phase IV of Enhanced Farmland Geographic Information System (eFGIS Digitization of Parcellary Maps and Farmland Database Development) |
NIACOIEC-S-3 |
47,799,000.00 |
NIACOIEC-S-3_supplemental-notice-no-1.pdf |
Supply and Delivery of Brand New Five (5) units Hydaulic Excavator, Wheeled Type, 4x4 DED, 0.40 cu.m. (minimum) Bucket Capacity |
NIACO-S-10 |
32,500,000.00 |
NIACO-S-10_supplemental-notice-no-1.pdf |
Supply and Delivery of Brand New One (1) unit Sports Utility Vehicle, Diesel Engine Displacement, 3000cc (maximum), A/T, 4x2 under NIA-CAR, Alfonso Lista Pump Irrigation Project |
CAR-ALPIP-S-1R |
2,200,000.00 |
CAR-ALPIP-S-1R_supplemental-notice-no-1.pdf |
Construction of Cabano Earthfill Dam and its Appurtenant Structures in Region 6 under Small Reservoir Irrigation Project |
R6-CSRIPD-C-36 |
545,398,633.78 |
R6-CSRIPD-C-36_supplemental-notice-no-1.pdf |
Supply and Delivery of Brand New One (1) unit Sports Utility Vehicle, Diesel Engine Displacement, 3000cc (maximum), A/T, 4x2 under NIA-CAR, Alfonso Lista Pump Irrigation Project |
CAR-ALPIP-S-1 |
2,200,000.00 |
CAR-ALPIP-S-1_supplemental-notice-no-2.pdf |
Supply and Delivery of Brand New One (1) Sports Utility Vehicle, Diesel Engine Displacement, 3000cc (maximum), 4x2 under NIA-CAR, Alfonso Lista Pump Irrigation Project |
CAR-ALPIP-S-1 |
2,200,000.00 |
CAR-ALPIP-S-1_supplemental-notice-no-1.pdf |
Supply and Delivery of Brand-New Various Motor Vehicles |
NIACO-S-9 |
77,000,000.00 |
NIACO-S-9_supplemental-notice- no-1.pdf |
Construction of Dumuloc Earthfill Dam and its Appurtenant Structures in Region 1 under Small Reservoir Irrigation project |
R1-DSRIPD-C-35 |
|
ITB No. R1-DSRIPD-C-35.pdf |
Construction of Bayuyan Earthfill Dam and its Appurtenant Structures in Region VI under Small Reservoir Irrigation Project |
R6-BSRIPD-C-34 |
|
ITB No R6-BSRIPD-C-34.pdf |
Procurement of Service Provider for the Phase III of Enhanced Farmland Geographic Information System (eFGIS Digitization of Parcellary Maps and Farmland Database Development) ITB No. NIACOIEC-S-1 |
NIACOIEC-S-1 |
|
ITB No. NIACOIEC-S-1.pdf |
Procurement of Service Provider for the Phase III of Enhanced Farmland Geographic Information System (eFGIS Digitization of Parcellary Maps and Farmland Database Development) |
NIACOIEC-S-1 |
48,168,729.00 |
NIACOIEC-S-1_supplemental-notice-no-1.pdf |
Procurement of Consultancy Services for the Reorganization Process of National Irrigation Administration |
NIACOMSD-CS-1 |
10,730,000.00 |
NIACOMSD-CS-1_supplemental-notice-no-4.pdf |
Procurement of Consultancy Services for the Reorganization Process of National Irrigation Administration |
NIACOMSD-CS-1 |
10,730,000.00 |
NIACOMSD-CS-1_ supplemental-notice-no- 3.pdf |
Procurement of Consultancy Services for the Reorganization Process of National Irrigation Administration |
NIACOMSD-CS-1 |
10,730,000.00 |
NIACOMSD-CS-1_supplemental-notice-no-2.pdf |
Procurement of Consultancy Services for the Reorganization Process of National Irrigation Administration |
NIACOMSD-CS-1 |
10,730,000.00 |
NIACOMSD-CS-1_supplemental-notice-no-1.pdf |
Supply, Delivery and Installation of Materials for Modular Workstation including Electrical Works and Furniture for the Renovation of the Engineering Department and Financial Management DepartmentOffices |
BS-002-2021 |
19,903,627.30 |
BS-002-2021_supplemental-notice-no-1.pdf |
Supply, Delivery and Installation of Materials for Modular Workstation including Electrical Works and Furniture for the Renovation of the Engineering Department and Financial Management Department Offices |
BS-002-2021 |
19,903,627.30 |
BS-002-2021_supplemental-notice-no-2.pdf |
Supplemental Notice No. 1 to the Bid Documents for the Supply and Delivery of Brand New Ninety-Five (95) units Pick-up Truck, Double cab, 4x4, DED, MT/AT, 3,000 cc (maximum) |
NIACO-S-8 |
161,800,000.00 |
NIACO-S-8_supplemental-notice-no-1.pdf |
Supplemental Notice No. 1 to the Bid Documents for the Supply, Delivery, Installation and Testing of Chemical Laboratory Equipment for Research/Soils and Water Laboratory Group, Irrigation Engineering Center |
BS-015-2020-R |
2,745,000.00 |
BS-015-2020-R_supplemental-notice-no-1.pdf |
Supplemental Notice No. 1 to the Bid Documents for the Supply, Delivery and Testing of Various IT Equipment for NIA Central Office |
BS-014-2020 |
11,454,000.00 |
BS-014-2020_supplemental-notice-no-1.pdf |
Supplemental Notice No. 2 to the Bid Documents for the Supply, Delivery, Installation and Testing of Geostudio Professional and Structural Analysis and Design (STAAD) Pro |
BS-011-2020 |
6,183,175.60 |
BS-011-2020_supplemental-notice-no-2.pdf |
Supplemental Notice No. 1 to the Bid Documents for the Supply, Delivery, Installation and Testing of Network Attached Storage |
BS-022-2020 |
1,500,000.00 |
BS-022-2020_supplemental-notice-no-1.pdf |
Supplemental Notice No. 4 to the Bid Documents for the Supply, Delivery and Installation of Materials for Modular Workstation Including Electrical Works and Furniture for the Renovation of the Financial Management Department Offices |
BS-002-2020-R2 |
6,275,825.16 |
BS-002-2020-R2_supplemental-notice-no-4.pdf |
Supplemental Notice No. 3 to the Bid Documents for the Supply, Delivery and Installation of Materials for Modular Workstation Including Electrical Works and Furniture for the Renovation of the Financial Management Department Offices |
BS-002-2020-R2 |
6,275,825.16 |
BS-002-2020-R2_supplemental-notice-no-3.pdf |
Supplemental Notice No. 3 to the Bid Documents for the Supply, Delivery and Installation of Materials for Modular Workstation Including Electrical Works and Furniture for the Renovation of the Engineering Department Offices |
BS-010-2020 |
13,603,627.30 |
BS-010-2020_supplemental-notice-no-3.pdf |
Supplemental Notice No. 2 to the Bid Documents for the Supply, Delivery and Installation of Materials for Modular Workstation Including Electrical Works and Furniture for the Renovation of the Financial Management Department Offices |
BS-002-2020-R2 |
6,275,825.16 |
BS-002-2020-R2_supplemental-notice-no-2.pdf |
Supplemental Notice No. 1 to the Bid Documents for the Supply, Delivery, Installation and Testing Geostudio Professional and Structural Analysis and Design (STAAD) Pro |
BS-011-2020 |
6,183,175.60 |
BS-011-2020_supplemental-notice-no-1.pdf |
Supplemental Notice No. 2 to the Bid Documents for the Supply, Delivery and Installation of Materials for Modular Workstation Including Electrical Works and Furniture for the Renovation of the Engineering Department Office |
BS-010-2020 |
13,603,627.30 |
BS-010-2020_supplemental-notice-no-2.pdf |
Supplemental Notice No. 1 to the Bid Documents for the Supply, Delivery and Installation of Materials for Modular Workstation Including Electrical Works and Furniture for the Renovation of the Financial Management Department Office |
BS-002-2020-R2 |
6,275,825.16 |
BS-002-2020-R2_supplemental-notice-no-1.pdf |
Supplemental Notice No. 1 to the Bid Documents for the Supply, Delivery and Installation of Materials for Modular Workstation including Electrical Works and Furniture for the Renovation of the Engineering Department Office |
BS-010-2020 |
13,603,627.30 |
BS-010-2020_supplemental-notice-no-1.pdf |
Supplemental Notice No. 1 to the Bid Documents for the Supply, Delivery and Installation of Various Engineering Software |
BS-016-2020 |
10,000,000.00 |
BS-016-2020_supplemental-notice-no-1.pdf |
Supplemental Notice No. 2 to the Bid Documents for the Supply, Delivery, Installation and Testing of Hyper Converged Infrastructure |
BS-012-2020 |
4,800,000.00 |
BS-012-2020_supplemental-notice-no-2.pdf |
Supplemental Notice No. 2 to the Bid Documents for the Procurement of Dam Information Management System Including Supply, Delivery, Installation, Testing and Commissioning of Equipment |
BS-001-2020-R2 |
8,714,400.00 |
BS-001-2020-R2_supplemental-notice-no-2.pdf |
Supplemental Notice No. 1 for the Procurement of Dam Information Management System Including Supply, Delivery, Installation, Testing and Commissioning of Equipment |
BS-001-2020-R2 |
8,714,400.00 |
BS-001-2020-R2_supplemental-notice-no-1.pdf |
Supplemental Notice No. 1 for the Supply, Delivery and Installation of Hyper Converged Infrastructure |
BS-012-2020 |
4,800,000.00 |
BS-012-2020_supplemental-notice-no-1.pdf |
Supplemental Notice No. 1 to the Bid Documents for the Supply and Delivery of Brand New 34 units-Pick-up Truck, Double Cab, 4x4, Diesel Engine Driven, 3000cc (maximum), under the NIA Central Officer |
NIACO-S-5R |
57,800,000.00 |
NIACO-S-5R_supplemental-notice-no-1.pdf |
Supplemental Notice No. 1 to the Bid Documents for the Printing and Delivery of NIA Wall and Table Calendar for CY 2021 |
BS-008-2020 |
3,050,000.00 |
BS-008-2020_supplemental-notice-no-1.pdf |
Supplemental Notice No. 1 to the Bid Documents for the Supply, Delivery, Installation and Testing of Laboratory Equipment for Research/Soils and Water Laboratory Group, IEC |
BS-005-2020 |
10,446,000.00 |
BS-005-2020_supplemental-notice-no-1.pdf |
Supplemental Notice No. 2 for the Excavation of Re-Regulating Pond, Construction of Slope Protection and Drainage Inlet under the Lower Agno River Irrigation System Improvement Project, ITB No. R1-LARISIPD-C-2R |
R1-LARISIPD-C-2R |
325,000,000.00 |
R1-LARISIPD-C-2R_supplemental-notice-no-2.pdf |
Supplemental Notice No. 1 for the Excavation of Re-Regulating Pond, Construction of Slope Protection and Drainage Inlet under the Lower Agno River Irrigation System Improvement Project, ITB No. R1-LARISIPD-C-2R |
R1-LARISIPD-C-2R |
325,000,000.00 |
R1-LARISIPD-C-2R_supplemental-notice-no-1.pdf |
Supplemental Notice No. 3 to the Bid Documents for the Excavation of Re-Regulating Pond, Construction of Slope Protection and Drainage Inlet (Sta. 0+000-Sta. 0+260 and Sta. 0+740-Sta. 1+270) under the Lower Agno River Irrigation System Improvement Project |
R1-LARISIPD-C-2 |
325,000,000.00 |
R1-LARISIPD-C-2_ supplemental-notice-no-3.pdf |
Supplemental Notice No. 2 to the Bid Documents for the Excavation of Re-Regulating Pond, Construction of Slope Protection and Drainage Inlet (Sta. 0+000-Sta. 0+260 and Sta. 0+740-Sta. 1+270) under the Lower Agno River Irrigation System Improvement Project |
R1-LARISIPD-C-2 |
325,000,000.00 |
R1-LARISIPD-C-2_supplemental-notice-no-2.pdf |
Excavation of Re-Regulating Pond, Construction of Slope Protection and Drainage Inlet (Sta. 0+000-Sta. 0+260 and Sta. 0+740-Sta. 1+270) under the Lower Agno River Irrigation System Improvement Project |
R1-LARISIPD-C-2 |
325,000,000.00 |
R1-LARISIPD-C-2_supplemental-bid-notice.pdf |