Repairs and Maintenance of Machineries and Equipment |
E-010-2025 |
120,000.00 |
Notice-of-Award E-010-2025.pdf |
Procurement of Appraisal Services for Real Property/Lands and Building |
SVP-022-2025 |
267,000.00 |
Notice-of-Award SVP-022-2025.pdf |
Supply and Delivery of Construction Supplies |
SVP-103-2025 |
808,000.00 |
Notice-of-Award SVP-103-2025.pdf |
Procurement of Service Provider for Comprehensive Autodesk Civil 3D Training |
SVP-113-2025 |
115,000.00 |
Notice-of-Award SVP-113-2025.pdf |
Supply and Delivery of Construction Supplies |
SVP-073-2025 |
793,754.48 |
Notice-of-Award SVP-073-2025.pdf |
Supply and Delivery of Audio Equipment |
SVP-077-2025 |
106,764.80 |
Notice-of-Award SVP-077-2025.pdf |
Supply and Delivery of Auto Parts |
SVP-111-2025 |
90,240.00 |
Notice-of-Award SVP-111-2025.pdf |
Supply and Delivery of Various Auto Parts |
SVP-101-2025 |
187,420.00 |
Notice-of-Award SVP-101-2025.pdf |
Procurement of Meals and Snacks |
SVP-095-2025 |
214,500.00 |
Notice-of-Award SVP-095-2025.pdf |
Supply and Delivery of Office Equipment |
SVP-085-2025 |
200,786.80 |
Notice-of-Award SVP-085-2025.pdf |
Supply and Delivery of IT Equipment |
SVP-091-2025 |
164,899.00 |
Notice-of-Award SVP-091-2025.pdf |
Supply, Delivery, and Testing of Drain Pump for Split Type Air Conditioning Unit (ACU) |
SVP-098-2025-RC |
62,344.00 |
Notice-of-Award SVP-098-2025-RC.pdf |
Supply and Delivery of Office Equipment |
SVP-096-2025 |
53,250.00 |
Notice-of-Award SVP-096-2025.pdf |
Supply and Delivery of Office Chair |
SVP-125-2025 |
522,444.00 |
Notice-of-Award SVP-125-2025.pdf |
Supply and Delivery of Various Auto Parts |
SVP-099-2025 |
130,740.00 |
Notice of Award SVP-099-2025.pdf |
Supply and Delivery of Audio, Visual Presentation and Composing Equipment |
SVP-047-2025 |
69,083.60 |
PO-2025-04-066.pdf |
Printing Service Invoice Receipt |
E-001-2025 |
2,376,900.00 |
Notice-of-Award-E-001-2025.pdf |
Supply and Delivery of Auto Parts of Toyota Altis SKW-584 |
SVP-056-2025 |
67,612.00 |
Notice-of-Award-SVP-056-2025.pdf |
Supply and Delivery of Auto Parts |
SVP-487-2024 |
79,640.00 |
Notice-of-Award-SVP-487-2024.pdf |
Supply and Delivery of 86" Interactive Flat Panel |
SVP-050-2025 |
300,000.00 |
Notice-of-Award-SVP-050-2025.pdf |
Supply, Delivery, and Installation of Auto Parts |
SVP-032-2025 |
50,684.00 |
Notice-of-Award-SVP-032-2025.pdf |
Supply and Delivery of IT Equipment |
SVP-089-2025 |
250,000.00 |
Notice-of-Award-SVP-089-2025.pdf |
Supply and Delivery of Auto Parts for 2019 Nissan Navara NP300 (FIZ-120) |
SVP-463-2025 |
190,166.00 |
Notice-of-Award-SVP-463-2024.pdf |
Modification and Improvement of Bath Tub Spillway and its Appurtenant Structures under Malinao Dam Improvement Project |
R7-MDIPD-C-4 |
738,540,000.00 |
R7-MDIPD-C-4 Notice of Award and Resolution of Award.pdf |
Supply and Delivery of Auto Parts |
SVP-029-2025 |
78,673.00 |
Notice-of-Award-SVP-029-2025.pdf |
Supply and Delivery of Influenza Vaccine |
SVP-083-2025 |
612,000.00 |
Notice-of-Award-SVP-083-2025.pdf |
Supply and Delivery of Oce Paper and Matte Film |
C-006-2025 |
80,000.00 |
Notice-of-Award-C-006-2025.pdf |
Procurement of Meals and Snacks |
SVP-090-2025 |
145,000.00 |
Notice-of-Award-SVP-090-2025.pdf |
Supply and Delivery of Office Equipment |
SVP-082-2025 |
145,000.00 |
Notice-of-Award-SVP-082-2025.pdf |
Supply, Delivery, and Installation of Synthetic Quartz Stone Finish |
SVP-024-2025 |
130,868.74 |
Notice-of-Award-SVP-024-2025.pdf |
Supply and Delivery of Consumables |
E-008-2025 |
287,100.00 |
Notice-of-Award-E-008-2025.pdf |
Supply and Delivery of Consumables |
E-005-2025 |
114,812.00 |
Notice-of-Award-E-005-2025.pdf |
Supply and Delivery of Photocopier Spare Parts |
E-006-2025 |
59,987.00 |
Notice-of-Award-E-006-2025.pdf |
Supply and Delivery of Consumables |
E-007-2025 |
81,240.00 |
Notice-of-Award-E-007-2025.pdf |
Supply and Delivery of Photocopier |
SVP-037-2025 |
70,000.00 |
Notice-of-Award-SVP-037-2025.pdf |
Repair of Photocopier Spare Parts |
E-004-2025 |
78,482.00 |
Notice-of-Award-E-004-2025.pdf |
Supply and Delivery of Fabrication Materials |
SVP-021-2025 |
124,933.45 |
Notice-of-Award-SVP-021-2025.pdf |
Supply, Delivery, and Installation of Auto Parts for 2013 Nissan Frontier Navara (SLG-230) |
SVP-466-2024 |
242,360.00 |
Notice-of-Award-SVP-466-2024.pdf |
Supply and Delivery of Purified/Distilled Water |
SVP-009-2025 |
710,400.00 |
Notice-of-Award-SVP-009-2025.pdf |
Supply and Delivery of Battery for Generator Set |
SVP-020-2025 |
85,700.00 |
Notice-of-Award-SVP-020-2025.pdf |
Rehabilitation of Potable Water System Supplies - Buildings A, B & ICC |
SVP-074-2025 |
845,865.00 |
Notice-of-Award-SVP-074-2025.pdf |
Procurement of Meals and Snacks: Representation Expenses for Meals and Snacks for Regular and Monthly meetings of NIA-CO offices for January 2025 |
SVP-001-2025 |
859,560.00 |
Notice-of-Award-SVP-001-2025.pdf |
Procurement of Meals and Snacks: Management Review of NIA Quality Management System (QMS) ISO 9001:2015, and Manager Conference on FY 2024 Performance Assessment and Implementation Planning on January 15-16, 2025 |
SVP-003-2025 |
363,600.00 |
Notice-of-Award-SVP-003-2025.pdf |
Procurement of Meals and Snacks: Representation Expenses for Meals and Snacks for Regular and Special Meetings of NIA CO office for the month of February 2025 |
SVP-002-2025 |
803,975.00 |
Notice-of-Award-SVP-002-2025.pdf |
Procurement of Meals and Snacks: Kadiwa sa NIA (IMTSS) CY 2025 Kadiwa ng Pangulo sa NIA Central Office Regular Operations and Unloading of BBM Rice |
SVP-013-2025 |
819,300.00 |
Notice-of-Award-SVP-013-2025.pdf |
Construction of San Felipe Earthfill Dam and its Appurtenant Structures in Region 1 under Small Reservoir Irrigation Project |
R1-SFSRIPD-C-42 |
1,312,536,422.13 |
Notice-of-Award-R1-SFSRIPD-C-42-BAC-A Resolution No. CW-NCB-2025-03.pdf |
Procurement of Meals and Snacks: Meals and Snacks for Regular Meetings in accordance with the NIA MC No. 114 s. 2022 for NIA CARP-IC employees covering the period of March to December 2025 |
SVP-015-2025 |
703,150.00 |
Notice-of-Award-SVP-015-2025.pdf |
Procurement of Meals and Snacks: Training on Cybersecurity on February 19-21, 2025 at the NIA Matikas Hall |
SVP-012-2025 |
158,400.00 |
Notice-of-Award-SVP-012-2025.pdf |
Supply and Delivery of Auto Parts |
SVP-496-2024 |
259,100.00 |
Notice-of-Award-SVP-496-2024.pdf |
Supply and Delivery of Customized T-Shirt: Customized Advocacy T-Shirt for FY 2025 Women's Month Celebration |
SVP-018-2025 |
271,180.00 |
Notice-of-Award-SVP-018-2025.pdf |
Lot No. 2 - Supply and Delivery of Various Brand-New Operation and Maintenance Equipment |
NIACO-S-22 |
364,168,000.00 |
NIACO-S-22-Notice of Award (Lot No. 2)-BAC-Reso.pdf |
Lot No. 1 - Supply and Delivery of Various Brand-New Operation and Maintenance Equipment |
NIACO-S-22 |
435,400,000.00 |
NIACO-S-22-Notice-of-Award-Lot1-BAC-RESO-.pdf |
Procurement of Meals and Snacks of National Irrigation Administration - Central Office for 10 Months |
BS-002-2025 |
9,682,600.00 |
Notice-of-Award-BS-002-2025.pdf |
Construction of Cabiao Water Impounding Project and its Appurtenant Structures |
R3-CWIPD-C-1 |
2,077,892,598.74 |
R3-CWIPD-C-Notice of Award-BAC-A RESOLUTION NO. CW-NCB-2025-01.pdf |
Supply and Delivery of Various Brand-New Dredging Machines and Accessories for NIA-MARIIS |
NIACO-S-21 |
299,320,000.00 |
NIACO-S-21-Notice of Award-BAC-A-Resolution.pdf |
Construction of Auxiliary Spillway and its Appurtenant Structures under Malinao Dam Improvement Project |
R7-MDIPD-C-3 |
664,442,950.70 |
MALINAO DAM-Notice-of-Award-BAC-A Resolution No. CW-NCB-2025-02.pdf |
Supply and Delivery of One (1) Year Subscription to Advance Weather Forecasting Solutions (Smart Farming Programme) |
NIACOEMD-S-1 |
450,000,000.00 |
NIACOEMD-S-1-Notice-of-Award-BAC-A Resolution of Award.pdf |
Supply and Delivery of Various Brand-New Service Vehicle for NIA-Magat River Integrated Irrigation System (NIA-MARIIS) |
NIACO-S-20 |
31,880,000.00 |
Notice-of-Award-NIACO-S-20_BAC-A-Resolution-No-SC-2024-08.pdf |
Lot No. 2 for the Supply and Delivery of Various Brand-New Transportation Equipment |
NIACO-S-18R |
22,094,050.00 |
Lot-2-Notice-of-Award-NIACO-S-18R-BAC-A-Reolution-SC-2024-07.pdf |
Lot No.1 for the Supply and Delivery of Various Brand-New Transportation Equipment |
NIACO-S-18R |
69,695,750.00 |
Lot-1-Notice-of-Award-NIACO-S-18R-BAC-A-Reolution-SC-2024-07.pdf |
Supply and Delivery of Brand-New Resistivity Instruments, and Core Drilling Equipment |
NIACOIEC-S-4R |
68,470,000.00 |
NIACOIEC-S-4R-NOA-SICCION MARKETING, INC.-BAC-A Resolution.pdf |
Lot No. 2 for the Supply and Delivery of Various Brand New Transportation Equipment for NIA Region 2 |
NIACO-S-19 |
1,554,995.00 |
NIACO-S-19 Notice of Award for Lot No. 2_BAC-A RESOLUTION NO. SC-2024-06.pdf |
Lot No. 1 for the Supply and Delivery of Various Brand New Transportation Equipment for NIA Region 2 |
NIACO-S-19 |
4,851,000.00 |
NIACO-S-19 Notice of Award for Lot No. 1_BAC-A RESOLUTION NO. SC-2024-06.pdf |
Lot No. 2 for the Supply and Delivery of Brand-New Unmanned Surface Vessel with GNSS RTK, Bathymetry, and LIDAR |
NIACODSD-S-1 |
5,996,000.00 |
NOA, Lot No. 2, NIACODSD-S-4.pdf |
Lot No. 1 for the Supply and Delivery of Brand-New Unmanned Surface Vessel with GNSS RTK, Bathymetry, and LIDAR |
NIACODSD-S-1 |
28,996,000.00 |
NOA, Lot No. 1, NIACODSD-S-4.pdf |
Lot No. 1 for the Procurement of Surveying Instrument (VTOL and LIDAR), Resistivity Instrument and Core Drilling Equipment |
NIACOIEC-S-4 |
59,498,988.00 |
BAC-A Resolution No. SC-2024-04-B_NIACOIEC-S-4-NOTICE OF AWARD.pdf |
Design and Construction of Earthfill Dam, Reservoir, Appurtenant Structures and Irrigation Facilities of Lopez Small Reservoir Irrigation Project under Design & Build in Region 4A |
R4A-LSRIPD-DB-01 |
|
BAC-A Resolution No. DB-NCB-2024-01-C_R4A-LSRIPD-DB-01-Notice of Award.pdf |
Construction of Hibale Earthfill Dam and Its Appurtenant Structures in Region VII under Small Reservoir Irrigation Project |
R7-HSRIPD-C-41 |
587,028,702.64 |
Notice of Award R7-HSRIPD-C-41_BAC-A_Resolution_CW-NCB-2024-05.pdf |
Construction of Libang Diversion Dam and its Appurtenant Structures of Libang River Irrigation Project |
R13-LRIPD-C-1 |
552,389,507.46 |
Notice_of_Award_BAC-A_Resolution_CW-NCB-2024-04_ITB_No.-R13-LRIPD-C-1.pdf |
Supply and Delivery of Various Brand-New Operations and Maintenance Equipment for Lot No.2 |
NIACO-S-17 |
181,784,399.90 |
Notice_of_Award_BAC_A_ResolutionSC-2024-01_ITB_No._NIACO-S-17_LotNo.2.pdf |
Supply and Delivery of Various Brand-New Operations and Maintenance Equipment for Lot No.1 |
NIACO-S-17 |
600,873,000.00 |
Notice_of_Award_NIACO-S-17.pdf |
Construction of Tulunan Earthfill Dam and its Appurtenant Structures in Region 12 under Small Reservoir Irrigation Project |
R12-BSRIPD-C-40 |
1,596,381,674.31 |
Notice of Award - BAC-A Resolution No. CW-NCB-2024-03.pdf |
Construction of Batingon Earthfill Dam and its Appurtenant Structures in Region 4B under Small Reservoir Irrigation Project |
R4B-BSRIPD-C-39 |
732,115,787.15 |
Notice of Award-BAC-A Resolution No. CW-NCB-2024-02.pdf |
Construction of Calapangan Earthfill Dam and its Appurtenant Structures in Region 2 under Small Reservoir Irrigation Project |
R2-CSRIPD-C-38 |
738,453,619.84 |
Notice of Award - R2-CSRIPD-C-38.pdf |
Supply and Delivery of Three Hundred Forty-Five (345) units Brand New Motorcycle |
NIACO-S-14R |
34,258,500.00 |
Notice_of_Award-NIACO-S-14R.pdf |
Supply and Delivery of Two (2) units Passenger Van and Eleven (11) units for Lot 1 |
NIACO-S-16 |
4,300,000.00 |
Notice of Award Lot 1 - NIACO-S-16.pdf |
Supply and Delivery of Two (2) units Passenger Van and Eleven (11) units for Lot 2 |
NIACO-S-16 |
16,729,900.00 |
Notice of Award - NIACO-S-16.pdf |
Retrofitting of Magat Dam Concrete Structures under Magat River Integrated Irrigation System |
R2-MARIISD-C-1 |
234,022,453.02 |
R2-MARIISD-C-1.pdf |
Construction of Bayabas Rockfill Dam and its Appurtenant Structures in Region 3 under Small Reservoir Irrigation Project |
R3-BSRIPD-C-37 |
1,941,121,209.17 |
Notice of Award - R3-BSRIPD-C-37.pdf |
Supply and Delivery of Various Type of Brand-New Excavator |
NIACO-S-15 |
775,600,000.00 |
Notice of Award NIACO-S-15.pdf |
Supply and Delivery of Lot 1: Brand New Three (3) units Pick-up Truck, Double Cab and Lot 2: Brand New Two (2) units Pick-up Truck, Single Cab, 12 feet Long Drop Side Body |
MMIPII-S-1R |
7,432,000.00 |
MMIPII-S-1R.pdf |
Establishment of Data Center Including Improvement of Management Information Division Office |
BS-017-2022 |
29,843,128.00 |
Notice_of_Award-BS-017-2023.pdf |
Supply and Delivery of Various Equipment, Lot 1 - One (1) unit Dump Truck, 6.0 cu.m. minimum |
R2-CRPIP-S-1 |
4,988,888.00 |
R2-CRPIP-S-1_notice-of-award.pdf |
Supply and Delivery of Various Equipment, Lot 2 - One (1) unit Excavator Long Arm Crawler , 0.5 cu.m. minimum |
R2-CRPIP-S-1 |
9,722,000.00 |
R2-CRPIP-S-1_notice-of-award.pdf |
Construction of Bayuyan Earthfill Dam and its Appurtenant Structures in Region 6 under Small Reservoir Irrigation Project |
R6-BSRIPD-C-34R4 |
401,715,404.62 |
R6-BSRIPD-C-34R4_notice-of-award.pdf |
Construction of Additional and Remaining Works of Bonot-Bonot Earthfill Dam and its Appurtenant Structures in Region 7 under Small Reservoir Irrigation Project |
R7-BSRIPD-C-27RW |
227,607,253.06 |
R7-BSRIPD-C-27RW_notice_of-award.pdf |
Supply and Delivery of One (1) unit Brand New Long Reach Excavator with Pontoon |
NIACO-S-13 |
12,000,000.00 |
NIACO-S-13_notice-of-award, .pdf |
Supply and Delivery of Seventeen (17) units Brand New Mini Dredging Equipment |
NIACO-S-12 |
140,000,000.00 |
NIACO-S-12_notice-of-award, .pdf |
Supply and Delivery of Two (2) units Brand New Passenger / Commuter Van |
NIACO-S-9R2 |
3,640,000.00 |
NIACO-S-9R2_notice-of-award.pdf |
Procurement of Service Provider for the Phase IV of Enhanced Farmland Geographic Information System (eFGIS Digitization of Parcellary Maps and Farmland Database Development) |
NIACOIEC-S-3 |
47,788,888.00 |
NIACOIEC-S-3_notice-of-award.pdf |
Construction of Remaining and Additional Works of Marimay Earthfill Dam and its Appurtenant Structures in CAR under Small Reservoir Irrigation Project |
CAR-MSRIPD-C-18RW |
238,685,268.11 |
CAR-MSRIPD-C-18RW_notice-of-award.pdf |
Supply, Delivery, Installation, Configuration and Testing of Network Expansion Equipment |
BS-001-2022 |
4,694,220.00 |
BS-001-2022_notice-of-award.pdf |
Supply and Delivery of Brand New Five (5) units Hydaulic Excavator, Wheeled Type, 4x4 DED, 0.40 cu.m. (minimum) Bucket Capacity |
NIACO-S-10 |
32,000,000.00 |
NIACO-S-10_notice-of-award.pdf |
Supply and Delivery of Three Hundred Forty Five (345) units Brand New Motorcycle |
NIACO-S-9R |
34,327,500.00 |
NIACO-S-9R_notice-of-award.pdf |
Construction of Cabano Earthfill Dam and its Appurtenant Structures in Region 6 under Small Reservoir Irrigation Project |
R6-CSRIPD-C-36 |
535,921,177.87 |
R6-CSRIPD-C-36_notice-of-award.pdf |
Supply and Delivery of Brand New Various Motor Vehicles for Lot 4: One (1) unit Brand New Walking/Spider Excavator |
NIACO-S-9 |
25,800,000.00 |
NIACO-S-9-LOT-4_notice-of-award.pdf |
Supply and Delivery of Brand New Various Motor Vehicles for Lot 3: One (1) unit Brand New Bus |
NIACO-S-9 |
8,995,000.00 |
NIACO-S-9-LOT-3_notice-of-award.pdf |
Supply and Delivery of Brand New Various Motor Vehicles for Lot 2: One (1) unit Brand New Mini Bus |
NIACO-S-9 |
3,495,000.00 |
NIACO-S-9-LOT-2_notice-of-award.pdf |
Construction of Dumuloc Earthfill Dam and its Appurtenant Structures in Region 1 under Small Reservoir Irrigation Project |
R1-DSRIPD-C-35 |
1,335,507,997.08 |
R1-DSRIPD-C-35_notice-of-award.pdf |
Procurement of Surveying Equipment for Farmland Geogrphic Information Systems (FGIS) in National Irrigation Systems under NIACO - Irrigation Engineering Center |
NIACOIEC-S-2 |
14,998,824.00 |
NIACOIEC-S-2_notice-of-award.pdf |
Procurement of Consultancy Services for the Reorganization Process of National Irrigation Administration |
NIACOMSD-CS-1 |
10,730,000.00 |
NIACOMSD-CS-1_notice-of-award.pdf |
Procurement of Service Provider for the Phase III of Enhanced Farmland Geographic Information System (eFGIS Digitization of Parcellary Maps and Farmland Database Development) |
NIACOIEC-S-1 |
48,168,729.00 |
NIACOIEC-S-1_notice-of-award.pdf |
Supply and Delivery of Brand New Ninety FIve (95) Units Pick-up Truck, Double Cab, 4x4, DED, MT/AT 3000 cc (maximum) |
NIACO-S-8 |
161,800,000.00 |
NIACO-S-8_notice-of-award.pdf |
Supply and Delivery of Brand New Thirty Four (34) Units Pick-Up Truck, Double Cab, 4x4, DED, 3000cc (Maximum) |
NIACO-S-5R |
57,800,000.00 |
NIACO-S-5R_notice-of-award.pdf |
Supply and Delivery of Eight (8) units Wheel Loader, 1.5 cu.m (minimum) |
NIACO-S-6R |
45,504,000.00 |
NIACO-S-6R_notice-of-award.pdf |
Construction of Appurtenant Pump Structures, including Supply, Delivery, Installation, Testing and Commissioning of Pump, Electric Motors, Valves, Discharge/Steel Pipes and other Electro-Mechanical Works under the Alfonso LIsta Pump Irrigation Project |
CAR-ALPIPD-C-2 |
455,849,747.94 |
CAR-ALPIPD-C-2_notice-of-award.pdf |
Construction of Balbalungao Earthfill Dam and its Appurtenant Structures under the Small Reservoir Irrigation Project |
SRIPD-C-33 |
832,973,704.72 |
SRIPD-C-33_notice-of-award.pdf |
Construction of Sulvec Earthfill Dam and its Appurtenant Structures (Remaining Works) under the Small Reservoir Irrigation Project |
SRIPD-C-26RW |
333,371,049.92 |
SRIPD-C-26RW_notice-of-award.pdf |
Construction of Ibato-Iraan Earthfill Dam and its Appurtenant Structures (Remaining Works) under the Small Reservoir Irrigation Project |
SRIPD-C-20RW |
322,832,438.17 |
SRIPD-C-20RW_notice-of-award.pdf |